Quality systems connecting documents and daily work
Explore quality system implementation and operation through document control, handover, process validation and improvement activities.
QMS / ISO 13485
How Many of 1,000 Parts Should Be Inspected: Sampling Plan by Inspection Level and AQL
This article compares the number of samples and acceptance/rejection criteria by inspection level and AQL using numerical examples from the current KS Q ISO 2859-1.
QMS / ISO 13485 Can the Sample Size of ISO 2859-1 be Applied to Developmental Performance Testing? This article distinguishes between lot acceptance sampling and the performance validation of new designs, explaining how to interpret the sample size in standards in conjunction with the scope, testing conditions, and basis for judgment.
QMS / ISO 13485 If There Is a Calibration Certificate, Can We Inspect with That Equipment? This article distinguishes between confirming the calibration history and the actual purposes of measurement.
It organizes questions comparing the certificate with inspection conditions using a hypothetical scenario where the usage range has changed.
QMS / ISO 13485 Defining the Scope of QMS Consulting: Preparing for the First Conversation This article outlines how to translate the request for an overall QMS into a specific scope of work.
It introduces questions and hypothetical consultation notes that clarify current state, priority tasks, necessary deliverables, and internal roles.
QMS / ISO 13485 Notification of Supplier Change: Records to Keep After Receiving the Email This practical guide connects the scope of changes, review basis, and applicable lots in a fictitious case of changing manufacturing location.
It contains practical questions and checklists to convert the supplier’s explanation into our product judgment records.
QMS / ISO 13485 Latest Files and On-Site Usage: What to Verify After Document Revisions? Just because a file is labeled as final does not mean it is the document you can use right now.
This outlines how to distinguish between approval status and implementation timing, the target processes and field copies, and how to check the actual application of revised operational work standards.
QMS / ISO 13485 Handover of QMS Operations Even When the Responsible Person Changes The handover of quality tasks does not simply end with the transfer of folders.
This outlines how to connect current status, reasoning, next actions, a hypothetical case of supplier evaluation, and handover confirmation questions.
QMS / ISO 13485 Maintaining a Quality System: Connecting Procedures with Actual Work What should be checked first when quality system documents exist but do not match actual operations? This article suggests practical methods for verifying the connection between procedures, responsibilities, records, and review results by following a single change task.
QMS / ISO 13485 ISO 13485 §7.5.6: When Is Process Validation Required? This document organizes the criteria for identifying processes that cannot be verified through subsequent monitoring of outputs and the logic for determining the scope of validation from a practical perspective.
QMS / ISO 13485 Can the Sample Size of ISO 2859-1 be Applied to Developmental Performance Testing? This article distinguishes between lot acceptance sampling and the performance validation of new designs, explaining how to interpret the sample size in standards in conjunction with the scope, testing conditions, and basis for judgment.
QMS / ISO 13485 If There Is a Calibration Certificate, Can We Inspect with That Equipment? This article distinguishes between confirming the calibration history and the actual purposes of measurement.
It organizes questions comparing the certificate with inspection conditions using a hypothetical scenario where the usage range has changed.
QMS / ISO 13485 Defining the Scope of QMS Consulting: Preparing for the First Conversation This article outlines how to translate the request for an overall QMS into a specific scope of work.
It introduces questions and hypothetical consultation notes that clarify current state, priority tasks, necessary deliverables, and internal roles.
QMS / ISO 13485 Notification of Supplier Change: Records to Keep After Receiving the Email This practical guide connects the scope of changes, review basis, and applicable lots in a fictitious case of changing manufacturing location.
It contains practical questions and checklists to convert the supplier’s explanation into our product judgment records.
QMS / ISO 13485 Latest Files and On-Site Usage: What to Verify After Document Revisions? Just because a file is labeled as final does not mean it is the document you can use right now.
This outlines how to distinguish between approval status and implementation timing, the target processes and field copies, and how to check the actual application of revised operational work standards.
QMS / ISO 13485 Handover of QMS Operations Even When the Responsible Person Changes The handover of quality tasks does not simply end with the transfer of folders.
This outlines how to connect current status, reasoning, next actions, a hypothetical case of supplier evaluation, and handover confirmation questions.
QMS / ISO 13485 Maintaining a Quality System: Connecting Procedures with Actual Work What should be checked first when quality system documents exist but do not match actual operations? This article suggests practical methods for verifying the connection between procedures, responsibilities, records, and review results by following a single change task.
QMS / ISO 13485 ISO 13485 §7.5.6: When Is Process Validation Required? This document organizes the criteria for identifying processes that cannot be verified through subsequent monitoring of outputs and the logic for determining the scope of validation from a practical perspective.
